Numerical Flow Simulation in FDAs "Critical Path" benchmark blood pump

Printed Book
SR 171
Inclusive of VAT
Sold as: EACH
Author:Narayanaswamy, Krishnaraj
Date of Publication: 2021
Book classification:Engineering,English Books,
No. of pages:62 Pages
Format:Paperback

This book is printed on demand and is non-refundable after purchase

Available Formats :

Printed Book

It will be sent to your address

SR171
Incl. VAT

Choose your delivery preference

Or

About this Product

Masters Thesis from the year 2019 in the subject Engineering - Mechanical Engineering, grade: 1.3, University of Rostock, course: Computational Science and Engineering, language: English, abstract: The work focuses on the analysis of the flow fields in the Food and Drug Administrations (FDA) Critical Path benchmark blood pump. The CAD model of the pump is an opensource material, so the thesis works started with the mesh generation. A block-structured hexahedral mesh has been created using ANSYS ICEM CFD 15.0. An unsteady (URANS) incompressible blood flow simulation has been performed using k-ω SST turbulence model, with one of the operating conditions prescribed by the experimental literature. The simulations were performed using ANSYS CFX 19.1 solver. The validated results for the flow field show promising results in the blade passage region and the diffuser regions but the pressure head obtained has some discrepancies which were analyzed and justified. In addition, a study on hemolysis prediction using Power Law was performed, and the blood damage values of the benchmark blood pump were calculated for the stress-based model in the Eulerian approach. The role of Computational Fluid Dynamics (CFD) in the biomedical field has increased a lot in recent years. The problems related to biocompatibility in medical and biological industries capture the attention of CFD engineers. One such biocompatible device is a Ventricular Assist Device (VAD). The development phase of VADs associates CFD to make it more robust. VADs generally incorporated with blood pumps, so it is essential to examine the dynamics of the blood flow in the pump and also to analyze the damages concerned with the blood cells. The U.S. Food and Drug Administration (FDA)and the Center of Devices and Radiological Health (CDRH) have sponsored certain CFDround-robins to validate the efficiency of computer simulations in biomedical applications. The Computational round-robin #2 concerns with a Crit
Show more

Specifications

SKU9783346238078
Manufacturer Number9783346238078
year published2021
Show more

Report an issue with this product.

Customer Reviews