مكتبة جرير

The Relationship between Main Contractors and Subcontractors in the Zambian Construction Industry:An Investigation

كتاب مطبوع
293ر.س.
شامل ضريبة القيمة المضافة
وحدة البيع: EACH
17ر.س.شهرياً/24 شهر
المؤلف:Mudzvokorwa, Tafadzwa
تاريخ النشر: 2017
تصنيف الكتاب:كتب الهندسة,الكتب الانجليزية,
عدد الصفحات:152 Pages
الصيغة:غلاف ورقي
هذا الكتاب يُطبع عند الطلب وغير قابل للاسترجاع بعد الشراء

الصيغ المتوفرة:

كتاب مطبوع

سيتم إرسال الطلب الى عنوانك

293ر.س.
شامل الضريبة

عن المنتج

Masters Thesis from the year 2016 in the subject Engineering - Civil Engineering, University of Zambia, course: Master of Engineering Project Management, language: English, abstract: In recent years there have been a substantial number of projects conducted in the Zambian construction industry. Due to the magnitude and complexity of many of these projects, contractors have resorted to subcontracting to share responsibilities and mitigate project risks. The Zambian government has also invigorated the practice of subcontracting in the construction industry as it plays an important role in increasing economy viability and building capacity. Instead of improving project success, subcontracting can act as a catalyst for poor project outcomes. Though there are many reasons that contribute to problems from subcontracting, a poor relationship between main contractors and subcontractors can be seen as a notorious contributor affecting construction works. The study aimed at investigating the relationship between the main contractors and subcontractors in the Zambian construction industry and recommend a framework that can be implemented to better the relationship. The study also examined the effects of a poor interface between main contractors and subcontractors in Zambia. Data collection techniques used included literature review, interviews and questionnaire surveys. The relative importance index was used to determine the ranking of the results of the study. Using the results adduced from the study a main contractor-subcontractor non-contractual partnering model was developed. The study established that the relationship between main contractors and subcontractors in Zambia is poor therefore needing attention. Interface problems were caused by payment issues, poor communication, unexpected price escalations and poor construction work. In order to address interface problems, the study found that there was need for better communication between the parties, timely payment
عرض أكثر

المواصفات

رقم الصنف9783668480124
رقم المصنع9783668480124
تاريخ النشر2017
عرض أكثر

أبلغ عن مشكلة مع هذا المنتج

مراجعات العملاء